When did you last take a trip down memory lane? Preparing my apartment for renovation meant going through boxes I hadn't touched in years. Old notebooks. Research papers. Drafts I'd forgotten I ever wrote.
Looking through them, I remembered how those papers actually came together back in university. Never from a finished plan. Always like this: 1. A rough skeleton, just the chapter titles I had in mind. 2. Start researching and writing in pieces, wherever the flow was. 3. Add detail, chapter by chapter. 4. Go back and adjust, once the research reshaped the argument. 5. End up with a full draft, built from something rough.
That was Agile before I had a word for it. Having something, even something rough, beats having nothing. That something is what shows you where to improve.
I see the same pattern with people I work with, myself included :) Some want everything done yesterday. Others question every detail until the project stalls before it starts (and never does). Both come from wanting it right. Only one of them ships anything. A good foundation matters. Planning it into perfection doesn't.
Perfect is the enemy of good.
Today, with AI, that first rough skeleton takes an afternoon instead of a semester. From there you draft the real architecture and build properly. Some things get figured out along the way. Some get adjusted more than once. And that's fine.
What matters is that every day good gets a little better.
